Centre Point
- Client:SummerHill
- Trash Management Plan: ATM
- Project:Multifamily — 694 units
- Location: Milpitas, CA
The Issues:
Successfully handle the large volume of waste and recyclables that will be generated by this large property.
The Solution:
-
Integrated a trash chute system for the residents with special towable trailer that would allow the trash/recyclables to be towed to the central compactor system.